Toolkit Home
Toolkit Banner

Contact

Phone: 1300 5 WATER (1300 5 92837)
Email: support@ewater.org.au

eWater
Innovation Centre
University of Canberra
ACT 2601
www.ewater.org.au

Features and Limitations

Caution Notes For User


Detailed data limitations are described in the documentation.
The key limitations relate to:
- The resolution of the DEM is such that the sinuosity of most of river channels is not fully represented;
- In very flat areas such as the Riverine Plain along the Murray, channel alignment has to be manually specified since the DEM does not provide a reasonable channel network;
- The upstream boundary of the network is not based on the appearance of formed river channel, but on the artificial threshold of 2 km2.
For the specific purpose of the project, limited checking of attributed data was carried out. Other users need to check the attributed data again for their own purposes.




About Contact Us | Privacy Statement | Site Map | This site brought to you by

Version: 5.0.3.20580